Maiden Dingo Range Gold Project Measured, Indicated and InferredMineral Resource Estimate of 28.0Mt @ 1.13g/t Au for 1,010Koz;Maiden resource includes the Boundary to Bungarra trend and Freeman’sFind Prospects which is constrained only by the drilling completed andremains open at depth and along strike;Work to date supports Emerald’s view that the Dingo Range Gold Projecthas the potential to be the Company’s first standalone mining andprocessing operation in Australia;+90% metallurgical recoveries anticipated from conventional CIL flowsheet (free milling);Drilling continues over the prospects in advance of further resourceupdates throughout 2025;Feasibility studies continue in advance of commencement of developmentin 2025;Various data sets for each calculation were finalised between Septemberand November 2024, subsequent intersections outside of the resourcecalculation expected to be included in the next update include; 19.0m @ 2.59g/t Au from 75.0m (RC24NPT132); 2.0m @ 15.09g/t Au from 15.0m (RC24FMF030); 5.7m @ 4.50g/t Au from 99.0m (RCDD22NPT030); 6.0m @ 3.90g/t Au from 96.0m (RC24FMF024); 22.0m @ 1.03g/t Au from 105.0m (RC24NPT126); 1.0m @ 21.00g/t Au from 8.0m (RC24HUR077); and 6.0m @ 2.74g/t Au from 112.0m (RC24HUR083).
Maiden Dingo Range Gold Project Measured, Indicated and Inferred
Mineral Resource Estimate of 28.0Mt @ 1.13g/t Au for 1,010Koz;
Maiden resource includes the Boundary to Bungarra trend and Freeman’s
Find Prospects which is constrained only by the drilling completed and
remains open at depth and along strike;
Work to date supports Emerald’s view that the Dingo Range Gold Project
has the potential to be the Company’s first standalone mining and
processing operation in Australia;
+90% metallurgical recoveries anticipated from conventional CIL flow
sheet (free milling);
Drilling continues over the prospects in advance of further resource
updates throughout 2025;
Feasibility studies continue in advance of commencement of development
in 2025;
Various data sets for each calculation were finalised between September
and November 2024, subsequent intersections outside of the resource
calculation expected to be included in the next update include;
19.0m @ 2.59g/t Au from 75.0m (RC24NPT132);
2.0m @ 15.09g/t Au from 15.0m (RC24FMF030);
5.7m @ 4.50g/t Au from 99.0m (RCDD22NPT030);
6.0m @ 3.90g/t Au from 96.0m (RC24FMF024);
22.0m @ 1.03g/t Au from 105.0m (RC24NPT126);
1.0m @ 21.00g/t Au from 8.0m (RC24HUR077); and
6.0m @ 2.74g/t Au from 112.0m (RC24HUR083).