Normal
its now 2024. The Indians, the Gina, the wait....,3 year chart (ignoring any calls on capital):[ATTACH=full]180879[/ATTACH].MT BEVAN MAGNETITE JOINT VENTURE COMPLETION OF PREFEASIBILITY STUDYHIGHLIGHTS• Financial analysis has determined a mid point NPV of $A1,674M, within a range of (A$740 M) to A$3,634 M; this range is highly sensitive to the model’s assumptions for long-term iron ore benchmark and premium pricing.• Capital investment is estimated at AUD $5B (USD $3.3B)• C1 operating costs of AUD $99/DMT (USD $64/DMT) for a 12mtpa operation.• According to metallurgical testing, the Project can achieve a Direct Reduction Iron product grade of >70% Fe, <2.5% Si at 45µm grind size with the potential to obtain a significant premium.• Study incorporates recently announced total Mineral Resource Estimate of 1,291 Mt... and the in the AFR todayI may be mathematically challenged, but isn't that equal to 100 per cent? So is it still listed? ((care factor Zero))Also, they're getting argy bargy saying red tape is holding up a green project. Bribe signal?
its now 2024. The Indians, the Gina, the wait....,
3 year chart (ignoring any calls on capital):
[ATTACH=full]180879[/ATTACH]
.
MT BEVAN MAGNETITE JOINT VENTURE COMPLETION OF PREFEASIBILITY STUDY
HIGHLIGHTS
• Financial analysis has determined a mid point NPV of $A1,674M, within a range of (A$740 M) to A$3,634 M; this range is highly sensitive to the model’s assumptions for long-term iron ore benchmark and premium pricing.
• Capital investment is estimated at AUD $5B (USD $3.3B)
• C1 operating costs of AUD $99/DMT (USD $64/DMT) for a 12mtpa operation.
• According to metallurgical testing, the Project can achieve a Direct Reduction Iron product grade of >70% Fe, <2.5% Si at 45µm grind size with the potential to obtain a significant premium.
• Study incorporates recently announced total Mineral Resource Estimate of 1,291 Mt
... and the in the AFR today
I may be mathematically challenged, but isn't that equal to 100 per cent? So is it still listed? ((care factor Zero))
Also, they're getting argy bargy saying red tape is holding up a green project. Bribe signal?
Hello and welcome to Aussie Stock Forums!
To gain full access you must register. Registration is free and takes only a few seconds to complete.
Already a member? Log in here.