Australian (ASX) Stock Market Forum

Reply to thread

Yep and a condition was it had to run hydrogen on commissioning, the ex head of Snowy had a blue with Bowen telling him there is no source for the Hydrogen, now the gas is an issue.


Don't you remember?

That's unusual, not.  Lol


Now it' s the problem of a 21km gas pipe and the stations location, after 5 years OMG, the lengths that people go to in the name of optics.


What after 4 years, they are so incompetent they only just worked  out its in the wrong spot, Green can dreaming at its best. FFS LOL.


If it was the other lot, they wouldn't have cared if it had to run on diesel, it's Labor that are using renewables as a stick to beat evetyone with, not the other lot.


It took less time to put in a gas pipeline from Karratha to Perth and that has since been duplicated.


One more term, that's all that's needed, for another 10 in the wilderness, funnily enough I thought this time would be different.


[URL unfurl="true"]https://www.google.com/amp/s/amp.abc.net.au/article/101379278[/URL]


Top